CHTC hot sale 4×2 150hp tipper truck with competitive price
Cabin
1.Left hand drive
2.With Merit air condition
3. All instruments and controls are easy to read and reach from the drivers position.
Engine
1. Original gasoline engine (4102ZLQ)
2. 150HP(110kW)
3. Euro II emission standard
Tire
1.8.25R16
2. Rear double tire
3. 4 pcs
Henan CHTC Construction Engineering Co., Ltd., the subsidiary of CHTC, was founded in 1998 with registered capital of 180 million CNY as a national designated manufacturer for the special-purpose vehicles, which is located in the Economic and Technical Development Zone, Zhengzhou City, Henan Province of China. The main products are Concrete Mixer Truck, Bulk Cement Truck, Dry-mixed Mortar Truck, Dump Truck, Sanitation Trucks and Facilities, Semi-Trailer Trucks, Wrecker Truck, Van Truck, Electric Cargo Truck, Recreational Vehicle and so on.
Safe packaging: anti-corrosion, anti-friction, to ensure the safe transport of vehicles.
More Professional Design Team
1. We have a professional team in the industrial design level to solve all the problems of vehicles, sure to answer all your question effectively within 24 hours.2.Our professional marketing staff ensure timely feedback to customer,design team will find the cause of the problem asap and provide solutions.Quickly Reply & Professional After-service Team
1. We have our own spare parts warehouse,at any time to maintain adequate supply of spare parts,ensure that all customer service issue to be solved within a week.2.And we provide some free wearing parts once you place order,will send out the free wearing parts with the vehicle together.
Q1. What is your terms of packing?A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?A: T/T 30% as deposit, and 70% before delivery. We’ll show you the photos of the products and packages before you pay the balance.Q3. How about your delivery time?A: Generally, it will take 5 to 10 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.Q4. Do you test all your goods before delivery?A: Yes, we have 100% test before delivery