EPG has been productively certified by ISO9002 High quality Management Program, ISO9001 Top quality Management Program, API certification, ISO/TS16949:2002 and ISO10012 measurement management technique. guarantees the security and consistency of the important function of components. we are self-confident to give our clients adaptable and diversified services.
9243839 ZX240-3 Excavator Ultimate Generate for Hitachi
ZX240-3 Substantial evaluation planetary EPT EPTs
Portion Identify |
HITACHI ZX243-three Journey REDUCTION |
Tools |
implement to HITACHI ZX200-3 EXCAVATOR |
SERIAL No. |
—- |
Class |
Building EPTry Areas, Excavator EPT Areas |
Installation |
EPT Teach |
Software |
Replacement |
Merchandise Issue |
NEW |
Emblem |
BN |
MOQ |
1 personal computer |
Component No. | Model | Part Name |
1032485 | ZX240-three | Provider |
3103051 | ZX240-three | PLANETARY Equipment |
421571 | ZX240-three | PIN |
4406589 | ZX240-three | BEARING |
4148080 | ZX240-3 | PLATE THRUST |
4173090 | ZX240-three | PIN SPRING |
4401293 | ZX240-three | SPACER |
ZX240-3 | Carrier ASYY | |
1032486 | ZX240-three | Provider |
3103052 | ZX240-three | PLANETARY Equipment |
435715 | ZX240-three | PIN |
4445529 | ZX240-three | BEARING |
421571 | ZX240-three | PLATE THRUST |
4246358 | ZX240-three | PIN SPRING |
4183819 | ZX240-three | SPACER |
ZX240-three | Carrier ASSY | |
1032487 | ZX240-three | Provider |
3103053 | ZX240-3 | Equipment PLANETARY |
4628766 | ZX240-3 | BEARING |
4139975 | ZX240-3 | PIN |
4624830 | ZX240-3 | PLATE THRUST |
4116309 | ZX240-3 | PIN SPRING |
ZX240-3 | Provider ASSY | |
2049585 | ZX240-three | PROP SHAFT |
3082149 | ZX240-three | Equipment EPT |
3103054 | ZX240-three | Gear EPT |
157123 | ZX240-three | HOUSING |
1032490 | ZX240-three | Gear RING |
1032488 | ZX240-3 | DRUM/HUB |
257190 | ZX240-3 | Cover |
4634693 | ZX240-three | FLOATING SEAL EPT |
4246793 | ZX240-3 | BEARING ROLL |
ZX240-3 | OIL SEAL | |
2049166 | ZX240-3 | MOTOR SHAFT |
DESCRIPTION:
one. Completely, assembly, and all set to set up in your HITACHI ZX243-three excavators.
2. Without MOTOR, currently been mounted the MOTOR HOUSING amp MOTOR SHAFT
3. All parts are produced by us.
4. All new, undamaged.
5. Painted or Unpainted, depend on prerequisite
6. ninety daEPTwarranty, contact or e mail with any questions.
7. Plywood Scenario EPT, totally free of fumigation
8. Deliver to around the world by Sea, Air, or Carrier.
WHY US:
- We are the company and very own 18000 m2 manufacturing facility locations, good partnership with content suppliers, which make a lot more aggressive price tag and regular quality.
- We have much more than 80 units EPT faXiHu (West Lake) Dis.Hu (West Lake) Dis.ties for generation.
- We have 8 senior engineers with a lot more than 30 many years encounter on developing and machining.
- Our product sales phrase offer you the efficient support for every single clients.
- We are the EPT expression areas provider for numerous renowned companies, this kind of as FOSTER WHEELER EPT EPTRY CO.,LTD and C.R.Dinly and so on.
- We deveXiHu (West Lake) Dis.Hu (West Lake) Dis. spare areas for outdated and new excavator types, and submit our most current goods to customers each month so that to meet up with the marketplace demand from customers.
- We have substantial market place share in Oversea market and Domestic market place, SouthEPT Asia sixty%, Russia ten%, Middle EPT eight%, North and South America 10%,Europe eight%, others 4%.
EPT Terms:
EPT Terms |
EXW, FOB, CFR, CIF |
PAYMENT Conditions |
T/T, Western Union, Alipay, Paypal |
PORT |
EPTngmen Port, negotiation |
Lead TIME |
|
Shipping and delivery |
By Sea, Air, Carrier |
OREPT Flow |
|
Warranty:
one. Warranty Type: We will exchange the item which have quality dilemma.
two. Guarantee Period:
EPT 3 months warranty for the merchandise from the date of arrival. Customer must check out the objects according to the orEPTlist after arrival. Speak to with us and offer you the information, photos of the problem things.
3. You want to shell out for the substitute charge for following problem:
* Mistaken OrEPTfrom buyer.
* Normal Disasters cause the hurt.
* Error installation.
* The EPT and EPT operate over time and above load.
* Missing by any issue.
* XiHu (West Lake) Dis.hu (West Lake) Dis.n component ruined.
* Corrode with rust throughout stock and running.
* Warranty Expired.
four. Others
They are the item simple to be rust away, you should wrap them nicely. We just source guarantee for the products we are producing, other than the EPT, Seal, and some others we point out before purchase.If there is any problem about the merchandise, set up or routine maintenance, make sure you contact with us any time. We reserve the legal rights of ultimate interpretation.